Arrabona EGTC

news

Work site for the active tourist entry and exit point in Dunakiliti handed over to the contractor

Information

  • Date

    02 June 2023

  • Location

    Dunakiliti (HU)

ETT infosheet

Share

In Dunakiliti, the construction of an active multifunctional tourist entry and exit point has started, which will be built at the junction of the Zátonyi-Dunaág and Gyümölcsös Street. The entry/exit point, which will be located at the crossroads of several active tourism routes, will cater mainly for water tourism, but will also be available for cyclists and pedestrians to  rest or change their means of transport.

The construction work is being carried out by LAL-ÉP 97 Bt. and the building is expected to be completed this year, ready to be used by tourists arriving in the village.

The consortium formed by the municipality and Arrabona EGTC has won a net grant of HUF 27.6 million under the call for proposals TOP_Plusz-1.1.3-21 Local and Regional Tourism Development. The application was prepared and managed by Arrabona EGTC as consortium partner.

Source of the article: Arrabona EGTC

Further information about the project can be found here.